Standard models: The current average market delivery time is approximately 52 days. While the industry average was 28 days in 2023, lead times have extended due to tight upstream component capacity.

 

High-capacity or custom-engineered models: Delivery times for custom, high-capacity units generally exceed 70 days; lead times extend further if special materials or non-standard structural designs are required.

 

Customization of core components:For large, non-standard core components-such as dryer riding rings-the standard customization lead time is typically 45–60 days, though expedited production can reduce this to around 35 days.

 

In-stock standard models: Common specifications available as ready-made inventory can be delivered immediately without a production wait, enabling a rapid response to urgent operational needs for small-to-medium capacity requirements.